ADMINISTRATIVE CHARGES/RATES
SFWD Board Res. #12. s. 2020
a. Certification Fee | P 100.00 |
b. Inspection Fee (HBC) | P 100.00 |
c. Reconnection | P 150.00 |
d. Transfer Tapping | P 700.00 or 50% of all materials used, whichever is higher. *If piercing equipment is needed – add holing / excavation fee of P 950.00 |
e. Relocation of water meter | 100% of the materials used *If piercing equipment is needed – add holing / excavation fee of P 1, 900.00 |
f. Water service connection (Single Stand Type which requires piercing equipment) | Basic installation fee plus holing / excavation fee of P 950.00 |
g. Change of account name for assumed connections | P 100.00 |